Skip to content

Latest commit

 

History

History

transit-repair

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 
 
 
 
 
 
 

Maintaining the existing transportation network and improving state of good repair are substantive priorities of ON TO 2050. In particular, recent investment in the transit system has been insufficient to keep system condition from declining. This indicator has three separate components.


This measures the percent of active revenue public transit buses that have exceeded their useful life. This represents the number of vehicles that have reached an age where maintenance cost and vehicle performance issues are likely to increase.

transit-repair-a.csv

Header Definition
YEAR Year of observation
CTA_BUSES_PAST_ULB Number of CTA buses that have met or exceeded their useful life (12-15 years)
CTA_BUSES_TOTAL Total number of CTA buses
PACE_BUSES_PAST_ULB Number of Pace buses that have met or exceeded their useful life (12 years)
PACE_BUSES_TOTAL Total number of Pace buses
PCT_BUSES_PAST_ULB Percentage of all buses (CTA and Pace) that have met or exceeded their useful life ((CTA_BUSES_PAST_ULB + PACE_BUSES_PAST_ULB) / (CTA_BUSES_TOTAL + PACE_BUSES_TOTAL) * 100)
ACTUAL_OR_TARGET Actual if the record is from observed data; Target if it is an ON TO 2050 target

Source: CMAP analysis of Federal Transit Administration (FTA) National Transit Database (NTD)

Geography: Seven-county CMAP region


This measures the percent of active revenue public transit rail vehicles that have exceeded their useful life. This represents the number of vehicles that have reached an age where maintenance cost and vehicle performance issues are likely to increase.

transit-repair-b.csv

Header Definition
YEAR Year of observation
CTA_RAILVEH_PAST_ULB Number of CTA rail vehicles that have met or exceeded their useful life (34 years)
CTA_RAILVEH_TOTAL Total number of CTA rail vehicles
METRA_RAILVEH_PAST_ULB Number of Metra rail vehicles that have met or exceeded their useful life (30 years)
METRA_RAILVEH_TOTAL Total number of Metra rail vehicles
PCT_RAILVEH_PAST_ULB Percentage of all rail vehicles (CTA and Metra) that have met or exceeded their useful life ((CTA_RAILVEH_PAST_ULB + METRA_RAILVEH_PAST_ULB) / (CTA_RAILVEH_TOTAL + METRA_RAILVEH_TOTAL) * 100)
ACTUAL_OR_TARGET Actual if the record is from observed data; Target if it is an ON TO 2050 target

Source: CMAP analysis of Federal Transit Administration (FTA) National Transit Database (NTD)

Geography: Seven-county CMAP region


This measures the percent of transit rail track with performance restrictions. The CTA refers to these as “slow zones”, where trains are required to operate at slower than normal speeds. This could be the result of construction, power systems, signals, or other issues. Elimination of slow zones can help to make transit more competitive by decreasing travel times and improving reliability.

transit-repair-c.csv

Header Definition
YEAR Year of observation
PCT_SLOW_ZONES Percentage of directional rail route miles with track performance restrictions
ACTUAL_OR_TARGET Actual if the record is from observed data; Target if it is an ON TO 2050 target

Source: CMAP analysis of Federal Transit Administration (FTA) National Transit Database (NTD)

Geography: Seven-county CMAP region