chore(deps): bump semantic-release from 25.0.0 to 25.0.1 #2150
Annotations
3 errors
|
test-node (22.20.0)
Process completed with exit code 1.
|
|
test-node (24.10.0)
The strategy configuration was canceled because "test-node._22_20_0" failed
|
|
test-node (24.10.0)
The operation was canceled.
|