You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Who: Seth and Josh D.
What: From CFD data, pick a nose cone design and finalize how we will build it.
When: 11/5-12/3
Where: Google Drive
Why: So Derousse has enough time to build the nose cone we need to get it done at the start of December.
The text was updated successfully, but these errors were encountered:
Who: Seth and Josh D.
What: From CFD data, pick a nose cone design and finalize how we will build it.
When: 11/5-12/3
Where: Google Drive
Why: So Derousse has enough time to build the nose cone we need to get it done at the start of December.
The text was updated successfully, but these errors were encountered: