You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Rate stream calculation often go between the space of rates and the space of accruals (e.g.: rate -> 1 + rate*time) or vice versa. This should be done the least number of times possible.
For example, calculating a discount factors ratio, to then get a forward rate, to then calculate an expected forward flow is a waste of computation, unless discrepancies between day_counts or similar details exist.
The text was updated successfully, but these errors were encountered:
Rate stream calculation often go between the space of rates and the space of accruals (e.g.: rate -> 1 + rate*time) or vice versa. This should be done the least number of times possible.
For example, calculating a discount factors ratio, to then get a forward rate, to then calculate an expected forward flow is a waste of computation, unless discrepancies between day_counts or similar details exist.
The text was updated successfully, but these errors were encountered: