Practice Quiz. • 30 min. • 10 total points available.10 total points
English
Assessment passed
Grade received 100%
How many rows appear in the preview result (or the Written column in the step metrics) after adding constants to the job change records?
1 / 1 point
- [ 18 ]
- 20
- 11
- 16
Correct
How many rows are inserted into the T_ERROR_LOG table after filtering the job change records for null value validation?
1 / 1 point
- 11
- 18
- [ 2 ]
- 6
Correct
The difference in business days between Contract_Date and Date_Promised calculated for Change_ID 115 is:
1 / 1 point
- 16
- 4
- [ 18 ]
- 3
Correct
The difference in business days between Date_Promised and Date_Ship_By calculated for Change_ID 102 is:
1 / 1 point
- 18
- 4
- 15
- [ 3 ]
Correct
How many rows are inserted into the T_ERROR_LOG table after filtering the job change records for date difference validation?
1 / 1 point
- 16
- 11
- 8
- [ 5 ]
Correct
1 / 1 point
- 16
- [ 8 ]
- 3
- 11
Correct
How many rows are inserted into the T_ERROR_LOG table after filtering the job change records for foreign key references validation including date foreign key references?
1 / 1 point
- 1
- 2
- 0
- [ 3 ]
Correct
1 / 1 point
- 8
- 16
- 0
- [ 6 ]
Correct
How many rows are inserted into the T_ERROR_LOG table after filtering the job change records for lead validation?
1 / 1 point
- 0
- [ 2]
- 8
- 5
Correct
What is the total number of rows inserted into the T_ERROR_LOG table at the end of the transformation?
1 / 1 point
- [ 12 ]
- 8
- 2
- 14
Correct