[2024 Q4 Audit] builders/chain-operators/tutorials/create-l2-rollup.mdx #917
Labels
a-critical
needs a lot of work
docs-audit-2024-Q4
OP Labs documentation audit
op-labs
Generally assigned for OP Labs employees. Please ask before you take on this issue.
p-critical
Tasks that have immediate deadlines or significant consequences if not completed on time.
s-M
(1-2 weeks) Tasks that involve a moderate level of complexity and collaboration.
Description of the updates required
This tutorial has been pinned at the Bedrock version of the OP Stack for a very long time and I've been kicking the can down the road because the underlying tooling has been in flux for quite sometime. Along with op-deployer, @mslipper wrote this PR to bring our docs up to date along with the devnet. This tutorial needs:
Github issue label criteria
Priority
p-on-hold
: (Defer) Tasks that are currently not actionable due to various reasons like waiting for external inputs, dependencies, or resource constraints. These are reviewed periodically to decide if they can be moved to a more active status.p-low
: (Nice to do) Tasks that have minimal impact on core operations and no immediate deadlines. These tasks are often more about quality of life improvements rather than essential needs.p-medium
: (Could do) Tasks that need to be done but are less critical than high-priority tasks. These often improve processes or efficiency but can be postponed if necessary without immediate severe repercussions.p-high
: (Should do) Important tasks that contribute significantly to long-term goals but may not have an immediate deadline. Delaying these tasks could have considerable negative effects but are not as immediate as critical tasks.p-critical
: Tasks that have immediate deadlines or significant consequences if not completed on time. These are non-negotiable and often linked to core business functions or legal requirements.T-shirt size
s-XS
: (< 1 day) Very simple tasks that require minimal time and effort.s-S
: (few days) Tasks that are straightforward but require a bit more time to complete.s-M
: (1-2 weeks) Tasks that involve a moderate level of complexity and collaboration.s-L
: (several weeks) Complex tasks that require significant time investment and coordination across multiple teams.s-XL
: (> 1 month) Very large and complex projects that involve extensive planning, execution, and testing.Content evaluation
- `a-delete`: don't need this page - `a-duplicate`: some content lives elsewhere - `a-minor`: needs small revisions - `a-moderate`: needs moderate revisions - `a-critical`: needs a lot of workMDX Metadata format
tags: ["tesetnets", "eng-platforms", "op-node", "op-geth", "batcher", "op-proposer", "op-challenger", "op-deployer"]
Component tags
Engineering tags
The text was updated successfully, but these errors were encountered: