You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Currently we can solve the ACOPF with standard network topologies (such as 9-bus, 118-bus etc). It would be useful to be able to solve ACOPF with a modified network topology -- (for example, the ability to solve a 9-bus system with a line removed or a generator removed). I think all the infrastructure is there -- and I think by adding an additional input to ProxALEvaluator will facilitate this.
The text was updated successfully, but these errors were encountered:
We need to implement generator contingencies as well @vishwas1984@michel2323. One easy way to do this is by setting its active and reactive power generation limits to 0.
Currently we can solve the ACOPF with standard network topologies (such as 9-bus, 118-bus etc). It would be useful to be able to solve ACOPF with a modified network topology -- (for example, the ability to solve a 9-bus system with a line removed or a generator removed). I think all the infrastructure is there -- and I think by adding an additional input to ProxALEvaluator will facilitate this.
The text was updated successfully, but these errors were encountered: