Skip to content

Migrate to uv

Migrate to uv #178

Triggered via push August 21, 2025 09:04
Status Failure
Total duration 54s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
lint
Process completed with exit code 1.
test (3.10)
Process completed with exit code 1.
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_10" failed