Skip to content

Latest commit

 

History

History
51 lines (40 loc) · 2.13 KB

issue_template.md

File metadata and controls

51 lines (40 loc) · 2.13 KB

Organizers:

Venue:

Date:

Curriculum:

For organizer/s or sponsor

Logistic items

  • Has venue and it sits this many people: ___
  • Has sponsor for food and drinks
  • Has organizer(s)
  • Has teacher(s)
  • Has date
  • Course selected
  • Draft of event started on Bridge Troll
  • Included in the event description if bikes are allowed inside or not (ask venue)
  • Included in the event description if child care is available or not

(Issue ready 🎯 to be labeled as scheduled 💥✌️🎉🎈🚀 after all tasks above are completed❗)

A couple weeks before the event

  • Order placed for catering, if applicable
  • Child care arranged for, if applicable

For GoBridge

First steps

  • Self-assigned the issue
  • Pinged the person who opened the issue
  • Google Hangout scheduled (if this is a first timer)

Continue taking the actions necessary to bring issue to a scheduled status according to our issue workflow.

After event is labeled as scheduled

  • Bridge Troll event made public; added event link to this thread
  • Opened a meetup event to point to the Bridge Troll event (RSVP on meetup should be closed)
  • Added a PR to add event to GoBridge's website (remove past events while at it)
  • First social media announcement's gone out
  • Conducted organizer training
  • Conducted teacher training
  • Assignee added event date -1 week to calendar as reminder

For lead organizer

Presentations

Event date -1 week

  • Confirmed venue and date
  • More rounds of announcements on social media. Mention how many spots left