Skip to content

Latest commit

 

History

History
14 lines (9 loc) · 519 Bytes

README.md

File metadata and controls

14 lines (9 loc) · 519 Bytes

EE374-Final-Project

✓ EE374-final-project-phase-1 & phase-2 solutions.

✓ According to the given data, the necessary parameters of the high voltage transmission lines are calculated.

✓ Explanations of the project are given in the

● EE374_2022_Spring_Project_Definition.pdf documentation.

● First phase calculates S_base, V_base, N_circuit, N_bundle, d_bundle, length, conductor_name, R_ac, outside_diameter, GMR_conductor.

● The second phase calculates resistance, reactance, and shunt capacitance.