Skip to content

Latest commit

 

History

History
4 lines (3 loc) · 229 Bytes

File metadata and controls

4 lines (3 loc) · 229 Bytes

Logistic Project: Installation of wifi-towers

Logistic project developed in AMPL and solved with CPLEX. The aim was to create a location model to be used for determining the optimal site location where to install wifi-towers.