Skip to content

Unit test smoke test #621

Unit test smoke test

Unit test smoke test #621

Triggered via schedule January 1, 2026 07:01
Status Failure
Total duration 5m 31s
Artifacts

smoke-test.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.11)
Process completed with exit code 1.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.9)
The operation was canceled.