You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Order from Mooring Systems for Turnaround Cruise January 2018
Have
Need
Item Code
Item
2
2
GCBS-7/8
7/8" galvanized, safety chain shackle, Crosby
2
2
GCBS-3/4
3/4" galvanized, safety chain shackle, Crosby
4
8
GABS-3/4
3/4" galvanized anchor bolt shackle, Crosby
1
6
GABS-5/8
5/8" galvanized anchor bolt shackle, Crosby
1
6
GPL-3/4
3/4" galvanized pear link, Crosby
Notes:
Added pear link and anchor shackle at swivel to be able to break above and below swivel.
Substitute 3/4" anchor shackle for 5/8" shackle to accommodate Hammerhead termination on wire rope, but still have standard termination at other end (just above the swivel) and need one 5/8 shackle.
Determine links and shackles needed and what spares we already have.
What spares do we already have? A: see table above
What size/type of shackle to accommodate the Hammerhead termination? A: 3/4" anchor shackle
Add notes to documentation and drawings for 2018 Turnaround
place order with Mooring Systems
delivery to Woods Hole
The text was updated successfully, but these errors were encountered:
Order from Mooring Systems for Turnaround Cruise January 2018
Notes:
Added pear link and anchor shackle at swivel to be able to break above and below swivel.
Substitute 3/4" anchor shackle for 5/8" shackle to accommodate Hammerhead termination on wire rope, but still have standard termination at other end (just above the swivel) and need one 5/8 shackle.
The text was updated successfully, but these errors were encountered: