You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
At the moment, the control limits are fixed at 95 and 99.8%. This may not be standard for all applications of funnel plots. It would be nice to have options to set these in funnel_plot.
The text was updated successfully, but these errors were encountered:
Yes, that would be a really nice feature. It need some substantial development time to redo this. The 95 and 99.8 correspond to the 2 and 3 standard error (sigma) type limits, but from a probability density perspective, they are 95% and 99.8%. Would be very happy to receive pull requests or have collaborators to rebuild it though, if you are interested?
At the moment, the control limits are fixed at 95 and 99.8%. This may not be standard for all applications of funnel plots. It would be nice to have options to set these in
funnel_plot
.The text was updated successfully, but these errors were encountered: