Scrum Master: Mehadi Note Taker: Heshani
Team meeting held on 07-March-2023 on Discord.
Meeting time 01:00 PM - 02:00 PM
-
Majid Khan Burki
-
Adi
-
Sumraish Hanif
-
Heshani
-
Mehadi
-
Adi walked through a git issue and thereafter demoed a git rebase to solve a bottleneck via Visual Studio Code and the terminal. An example was shown followed by the solution to the problem at hand.
-
The team agreed on the process change to test their code via a public repo under their own github account linked to codesandbox.io and thereafter push those changes to the H Team github repo for review. This involved setting and unsetting remote urls, fetching, pulling, rebasing and pushing via Git.