Replies: 1 comment
-
Complete |
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
On the foundation of adding a 95% CI band of the gam fit line to the original graphs, add a vertical line to each point of fitted value. The range of this vertical line is as follows:
{
B <- gam_fit_model()
Pred.b = Predict(B, se.fit=T) # predicted value and sd
Lowerbound= Pred.b$fit- 1.96pred.b$se.fit
Upperbound=Pred.b$fit+1.96pred.b$se.fit
(95 CI%)
}
Add-on to ggplot()
{
geom_errorbar(aes(ymin=fitted(m)-1.96se, ymax=fitted(m)+1.96se), width=.1)
}
@leahghazali @nami-jain @RuobinGong
Beta Was this translation helpful? Give feedback.
All reactions