Versioning unification, dependencies update, logging optimization #12557
Triggered via pull request
October 6, 2024 08:54
Status
Cancelled
Total duration
28m 29s
Artifacts
–
build_and_test.yml
on: pull_request
Matrix: common
ubuntu
4m 8s
fuzzers-preflight
2s
changes
6s
ubuntu-doc-build
2m 38s
ubuntu-doc-test
2m 14s
ubuntu-miri
27m 40s
ubuntu-clippy
3m 13s
python-bindings
7m 24s
cargo-fmt
1m 50s
check-md-links
1m 23s
nostd-build
1m 11s
nostd-clippy
38s
format-toml
4s
build-docker
5m 31s
macos
2m 53s
ios
1m 4s
android
1m 23s
Matrix: llvm-tester
windows-frida-libpng
11m 9s
windows-frida-libfuzzer-stb-image
9m 42s
windows-frida-gdiplus
11m 12s
windows-tinyinst-simple
11m 12s
windows-clippy
7m 29s
ubuntu-concolic
1m 0s
Matrix: ubuntu-check
Matrix: fuzzers
Matrix: fuzzers-qemu
Annotations
38 errors
nostd-clippy
Process completed with exit code 101.
|
macos
Process completed with exit code 101.
|
ubuntu-clippy
Process completed with exit code 101.
|
ubuntu-check (9)
Process completed with exit code 1.
|
ubuntu-check (6)
The job was canceled because "_9" failed.
|
ubuntu-check (10)
The job was canceled because "_9" failed.
|
ubuntu-check (10)
The operation was canceled.
|
ubuntu-check (2)
The job was canceled because "_9" failed.
|
ubuntu-check (2)
The operation was canceled.
|
ubuntu-check (11)
The job was canceled because "_9" failed.
|
ubuntu-check (11)
The operation was canceled.
|
ubuntu-check (3)
The job was canceled because "_9" failed.
|
ubuntu-check (3)
The operation was canceled.
|
ubuntu-check (15)
The job was canceled because "_9" failed.
|
ubuntu-check (15)
The operation was canceled.
|
ubuntu-check (7)
The job was canceled because "_9" failed.
|
ubuntu-check (7)
The operation was canceled.
|
ubuntu-check (0)
The job was canceled because "_9" failed.
|
ubuntu-check (0)
The operation was canceled.
|
ubuntu-check (13)
The job was canceled because "_9" failed.
|
ubuntu-check (13)
The operation was canceled.
|
ubuntu-check (14)
The job was canceled because "_9" failed.
|
ubuntu-check (14)
The operation was canceled.
|
ubuntu-check (8)
The job was canceled because "_9" failed.
|
ubuntu-check (8)
The operation was canceled.
|
ubuntu-check (17)
The job was canceled because "_9" failed.
|
ubuntu-check (17)
The operation was canceled.
|
ubuntu-check (5)
The job was canceled because "_9" failed.
|
ubuntu-check (5)
The operation was canceled.
|
ubuntu-check (16)
The job was canceled because "_9" failed.
|
ubuntu-check (16)
The operation was canceled.
|
windows-clippy
Process completed with exit code 1.
|
ubuntu-miri
Canceling since a higher priority waiting request for 'build and test-refs/pull/2560/merge' exists
|
ubuntu-miri
The operation was canceled.
|
fuzzers-qemu (ubuntu-24.04, ./fuzzers/binary_only/qemu_cmin)
Canceling since a higher priority waiting request for 'build and test-refs/pull/2560/merge' exists
|
fuzzers-qemu (ubuntu-24.04, ./fuzzers/binary_only/qemu_coverage)
Canceling since a higher priority waiting request for 'build and test-refs/pull/2560/merge' exists
|
fuzzers-qemu (ubuntu-24.04, ./fuzzers/full_system/qemu_baremetal)
Canceling since a higher priority waiting request for 'build and test-refs/pull/2560/merge' exists
|
fuzzers-qemu (ubuntu-24.04, ./fuzzers/full_system/qemu_baremetal)
The operation was canceled.
|