Skip to content
This repository has been archived by the owner on Oct 3, 2022. It is now read-only.

Assignments

Marvin Binder edited this page Feb 26, 2020 · 2 revisions

A project is made up of several assignments. These typically are named "Planning" or "Research" and contain more concise Subtasks (e.g. "Drawing a diagram", "Looking up information in the wiki"). Assignments have different status:

  • Future - the assignment was created
  • Active - there has already been work time generated on this specific assignment
  • Done - the assignment was completed
  • Aborted - the assignment was aborted
  • Postponed - the date planned or the due date for the assignment was changed while still active

Assignment overview

The assignment overview contains controls to create, edit and delete the assignment. You also can edit the subtasks planned for this assignment or create new. The buttons at the bottom are for changing the status of the assignment (left for done, right for abort).

Assignment overview

Clone this wiki locally