Skip to content

Ready for PR

Ready for PR #272

Triggered via push November 16, 2023 09:43
Status Failure
Total duration 6h 26m 27s
Artifacts

codeql.yml

on: push
Matrix: analyze-linux
Matrix: analyze-macos11
Matrix: analyze-msys2
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Analyze macOS 11 (Qt GUI, Dev, ODR, x86_64)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
Analyze macOS 11 (Qt GUI, Dev, ODR, x86_64)
The operation was canceled.
Analyze macOS 11 (Qt GUI, Dev, NDR, x86_64)
The job was canceled because "cpp_Dev_experimental_-D_2" failed.
Analyze macOS 11 (Qt GUI, Dev, NDR, x86_64)
The operation was canceled.