correct sphinx, pylint issues
Browse files Browse the repository at this point in the history
  • Loading branch information
bpaul4 committed Aug 9, 2023
1 parent 62a0113 commit c5533e5
Showing 1 changed file with 20 additions and 19 deletions.
39 changes: 20 additions & 19 deletions idaes/models_extra/power_generation/costing/power_plant_capcost.py
Original file line number Diff line number Diff line change
Expand Up @@ -1672,7 +1672,8 @@ def get_REE_costing(
"""
The scaled cost is computed using reference values for different
technologies as listed below:
1. University of Kentucky Fire Clay Seam (Hazard No. 4) Rejects
1. University of Kentucky Fire Clay Seam (Hazard No. 4) Rejects
Args:
blk: A unit-level costing block where costing variables and
constraints can be added to
Expand Down Expand Up @@ -1777,7 +1778,7 @@ def get_REE_costing(
else: # this is not allowed
raise ValueError(
"Data already exists for Account {} "
"using technology {} with CCS {}. "
"using technology {}. "
"Please confirm that the custom "
"account dictionary is correct, or "
"add the new parameters as a new "
Expand Down Expand Up @@ -1863,7 +1864,7 @@ def get_REE_costing(
except KeyError:
print(
"KeyError: Account {} could not be found in the "
"dictionary for technology {} with CCS {}".format(
"dictionary for technology {}".format(
account, str(tech)
)
)
Expand Down Expand Up @@ -3008,22 +3009,22 @@ def get_REE_plant_costs(
):
"""
Creates constraints for the following plant-level costs in $MM/yr:
1. Total ancillary
2. Piping materials and labor ancillary
2. Electrical materials and labor ancillary
3. Instrumentation ancillary
4. Plant services ancillary
5. Total buildings
6. Process buildings
7. Auxiliary buildings
8. Site improvements buildings
9. Total engineering procurement and construction management (EPCM)
10. Equipment installation EPCM
11. Field expenses EPCM
12. Project management and construction EPCM
13. Total contingency
14. Process contingency
(space for more costs, including contingency costs, in the future)
1. Total ancillary
2. Piping materials and labor ancillary
3. Electrical materials and labor ancillary
4. Instrumentation ancillary
5. Plant services ancillary
6. Total buildings
7. Process buildings
8. Auxiliary buildings
9. Site improvements buildings
10. Total engineering procurement and construction management (EPCM)
11. Equipment installation EPCM
12. Field expenses EPCM
13. Project management and construction EPCM
14. Total contingency
15. Process contingency
16. (space for more costs, including contingency costs, in the future)
These costs apply to the project as a whole and are scaled based on the
total TPC.
Expand Down