add an important note #4716
test.yml
on: push
linux-x86-64-unit
3m 53s
mac-x86-64-unit
3m 54s
win-x86-64-unit
3m 35s
linux-x86-64-kdf-integration
3m 52s
mac-x86-64-kdf-integration
3m 53s
win-x86-64-kdf-integration
3m 35s
docker-tests
3m 51s
wasm
3m 53s
Annotations
16 errors
win-x86-64-unit
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
win-x86-64-unit
The operation was canceled.
|
win-x86-64-kdf-integration
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
win-x86-64-kdf-integration
The operation was canceled.
|
docker-tests
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
docker-tests
The operation was canceled.
|
linux-x86-64-unit
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
linux-x86-64-unit
The operation was canceled.
|
linux-x86-64-kdf-integration
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
linux-x86-64-kdf-integration
The operation was canceled.
|
wasm
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
wasm
The operation was canceled.
|
mac-x86-64-kdf-integration
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
mac-x86-64-kdf-integration
The operation was canceled.
|
mac-x86-64-unit
Canceling since a higher priority waiting request for 'Test-refs/heads/graceful-shutdown-on-ctrl-c' exists
|
mac-x86-64-unit
The operation was canceled.
|