Update tests to use temporary RMQ instance and improve coverage #233
unit_tests.yml
on: pull_request
Matrix: backwards_compat_tests
Matrix: unit_tests
Annotations
6 errors and 4 warnings
unit_tests (3.10)
Failed to CreateArtifact: Received non-retryable error: Failed request: (409) Conflict: an artifact with this name already exists on the workflow run
|
unit_tests (3.11)
The job was canceled because "_3_10" failed.
|
unit_tests (3.11)
The operation was canceled.
|
unit_tests (3.9)
The job was canceled because "_3_10" failed.
|
unit_tests (3.8)
The job was canceled because "_3_10" failed.
|
unit_tests (3.8)
The operation was canceled.
|
backwards_compat_tests (3.8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
backwards_compat_tests (3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
unit_tests (3.12)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
unit_tests (3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
backward-compatibility-test-results-3.10
|
453 Bytes |
|
backward-compatibility-test-results-3.12
|
452 Bytes |
|
backward-compatibility-test-results-3.8
|
453 Bytes |
|
backward-compatibility-test-results-3.9
|
454 Bytes |
|
connector-test-results-3.10
|
573 Bytes |
|
connector-test-results-3.12
|
573 Bytes |
|
connector-test-results-3.9
|
566 Bytes |
|
utils-test-results-3.10
|
579 Bytes |
|
utils-test-results-3.11
|
571 Bytes |
|
utils-test-results-3.12
|
570 Bytes |
|
utils-test-results-3.8
|
576 Bytes |
|
utils-test-results-3.9
|
580 Bytes |
|