Fix unwanted changes came in by copy and paste #2002
test-e2e.yml
on: push
Fullstack test preparation
8m 50s
Matrix: Fullstack tests
Cleanup
0s
Annotations
9 errors
Fullstack tests (7)
Process completed with exit code 1.
|
Fullstack tests (2)
The job was canceled because "_7" failed.
|
Fullstack tests (2)
The operation was canceled.
|
Fullstack tests (8)
The job was canceled because "_7" failed.
|
Fullstack tests (8)
The operation was canceled.
|
Fullstack tests (3)
The job was canceled because "_7" failed.
|
Fullstack tests (3)
The operation was canceled.
|
Fullstack tests (4)
The job was canceled because "_7" failed.
|
Fullstack tests (4)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
ocelot-e2e-test-report-pr
Expired
|
1.27 MB |
|