Skip to content

Major dependencies upgrades #9

Major dependencies upgrades

Major dependencies upgrades #9

Triggered via push June 17, 2024 07:11
Status Failure
Total duration 3m 1s
Artifacts

integration.yml

on: push
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

7 errors
integration (3.9)
Process completed with exit code 2.
integration (3.11)
The job was canceled because "_3_9" failed.
integration (3.11)
The operation was canceled.
integration (3.8)
The job was canceled because "_3_9" failed.
integration (3.8)
The operation was canceled.
integration (3.10)
The job was canceled because "_3_9" failed.
integration (3.10)
The operation was canceled.