BuildNewCommits #7
BuildNewCommits.yml
on: workflow_dispatch
Prepare Matrix
29s
Matrix: Build Commits
Annotations
6 errors
Build Commits (be)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
|
Build Commits (be)
The operation was canceled.
|
Build Commits (ru)
The job running on runner GitHub Actions 32 has exceeded the maximum execution time of 360 minutes.
|
Build Commits (ru)
The operation was canceled.
|
Build Commits (no)
The job running on runner GitHub Actions 21 has exceeded the maximum execution time of 360 minutes.
|
Build Commits (no)
The operation was canceled.
|