Skip to content

feat(step2): fix well number issue #100

feat(step2): fix well number issue

feat(step2): fix well number issue #100

Triggered via push December 27, 2024 06:46
Status Failure
Total duration 1m 42s
Artifacts

CI.yml

on: push
Matrix: build
Matrix: Run all tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 2 warnings
Run all tests (16.x)
Process completed with exit code 1.
Build with 16.x
Process completed with exit code 1.
Build with 18.x
The job was canceled because "_16_x" failed.
Build with 18.x
The operation was canceled.
Build with 20.x
The job was canceled because "_16_x" failed.
Build with 20.x
The operation was canceled.
Run all tests (16.x)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Build with 16.x
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636