Quantum job sequencing algorithm

This repository contains sample code for solving job sequencing problem (JSP) with deadlines using quantum annealing.

Key features include:

  • JSP to QUBO converter,
  • JSP to linear programming converter,
  • Brute-force solver (small scale refence),
  • PULP solver (linear programming),
  • DWave solver (quantum annealer).

Problem formulation

Input:

  • There exists n tasks and 1 worker,
  • Worker can execute only 1 task at a time,
  • Each task has deadline d_i, runtime t_i and reward p_i,
  • Reward is given for each task that completes before deadline,
  • Tasks can be executed in any order. Target:
  • Find optimal job sequence, that maximizes total reward.

Quick-start

Install dependencies

pip install -r requirements.txt

Prepare random task instance and compute schedule using LP solver (pulp)

from utils import make_random_task, visualize
from solver import solve_qubo
from qubo import make_qubo, decode_result

times, deadlines, profits = make_random_task(num_jobs = 4, max_time = 5)
Q = make_qubo(times, deadlines, profits)
spins, energy = solve_qubo(Q, engine = "pulp")
results, score = decode_result(times, deadlines, profits, spins)
print("Total score is %d" % score)
visualize(results, save = "schedule.png")

You can find job schedule results dict or in schedule.png.

schedule

For quantum annealer backend register on D-Wave Leap and insert your API_KEY below:

spins, energy = solve_qubo(Q, engine = "dwave", API_KEY = "YOUR_API_KEY_HERE")