test(system): cgroups test with virtualisation disabled #272
node.js.yml
on: push
List Packages
3s
www
1m 48s
Matrix: Package Test
Annotations
4 errors
www
Process completed with exit code 1.
|
Package Test (18.x, core)
Process completed with exit code 3.
|
Package Test (18.x, network)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
|
Package Test (18.x, network)
The operation was canceled.
|