Skip to content

wip still, normalizing paths to root and os #51

wip still, normalizing paths to root and os

wip still, normalizing paths to root and os #51

Triggered via push March 23, 2024 21:30
Status Failure
Total duration 32s
Artifacts

test.yaml

on: push
Matrix: Go Test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Go Test (1.22, windows-latest)
Process completed with exit code 1.
Go Test (1.22, macos-latest)
The job was canceled because "_1_22_windows-latest" failed.
Go Test (1.22, macos-latest)
The operation was canceled.
Go Test (1.22, ubuntu-latest)
The job was canceled because "_1_22_windows-latest" failed.
Go Test (1.22, ubuntu-latest)
The operation was canceled.