The primary objective of this Continuous Evaluation Project is to calculate the electric load for the Mechanical Engineering Department. This objective leads to the economic and environmental evaluation of an optimum sized power plant for building of Mechanical Engineering Department MUST.
ahsanpk053/Electrical-Load-Calculation
Folders and files
Name | Name | Last commit message | Last commit date | |
---|---|---|---|---|
Repository files navigation
About
The primary objective of this Continuous Evaluation Project is to calculate the electric load for the Mechanical Engineering Department. This objective leads to the economic and environmental evaluation of an optimum sized power plant for building of Mechanical Engineering Department MUST.