chore: update bufbuild/protoc-gen-validate v1.0.2 to v1.0.4 #31188
test.yaml
on: pull_request
path-filter
2s
enable-automerge-renovate
0s
prettier
/
prettier
10s
ci-info
11s
check-files
/
check-files
3s
generate-registry
/
generate-registry
json-schema
/
json-schema
renovate-config-validator
/
...
/
renovate-config-validator
test-docker
/
test-docker
Matrix: test
status-check
0s
Annotations
10 errors
test (ubuntu-latest)
Process completed with exit code 1.
|
test (ubuntu-latest, arm64)
Process completed with exit code 1.
|
test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
|
test (macos-latest, darwin, arm64)
The job was canceled because "ubuntu-latest" failed.
|
test (macos-latest, darwin, arm64)
The operation was canceled.
|
test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
test (windows-latest)
The operation was canceled.
|
test (windows-latest, arm64)
The job was canceled because "ubuntu-latest" failed.
|
test (windows-latest, arm64)
The operation was canceled.
|
status-check
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
ci-info
Expired
|
18 KB |
|