Skip to content

[TEST] Merge v1.1.0 #599

[TEST] Merge v1.1.0

[TEST] Merge v1.1.0 #599

Triggered via pull request October 21, 2024 08:59
@yutianwuyutianwu
synchronize #163
merge-v1.1.0
Status Failure
Total duration 14m 39s
Artifacts

integration.yml

on: pull_request
Matrix: test
integration success
3s
integration success
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test / bsc
Process completed with exit code 101.
test / optimism
The job was canceled because "bsc" failed.
test / optimism
The operation was canceled.
test / ethereum
The job was canceled because "bsc" failed.
test / ethereum
The operation was canceled.
integration success
Process completed with exit code 1.