Skip to content

feat: sync task engine for parlia(bsc) #223

feat: sync task engine for parlia(bsc)

feat: sync task engine for parlia(bsc) #223

Triggered via pull request June 21, 2024 06:43
Status Failure
Total duration 17m 41s
Artifacts

unit.yml

on: pull_request
Matrix: doc
Matrix: test
Ethereum state tests
17m 17s
Ethereum state tests
unit success
3s
unit success
Fit to window
Zoom out
Zoom in

Annotations

12 errors
test / bsc (1/3)
Process completed with exit code 101.
test / optimism (3/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (3/3)
The job was canceled because "_1_bsc" failed.
test / bsc (2/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (2/3)
The job was canceled because "_1_bsc" failed.
test / optimism (2/3)
The job was canceled because "_1_bsc" failed.
test / optimism (1/3)
The job was canceled because "_1_bsc" failed.
test / optimism (1/3)
A task was canceled.
test / ethereum (1/3)
The job was canceled because "_1_bsc" failed.
test / ethereum (1/3)
The operation was canceled.
unit success
Process completed with exit code 1.