Skip to content

Adapt integration tests to reuse the packed charm #91

Adapt integration tests to reuse the packed charm

Adapt integration tests to reuse the packed charm #91

Triggered via pull request August 25, 2023 10:37
Status Cancelled
Total duration 26m 43s
Artifacts 2

integration_test.yaml

on: pull_request
integration-tests  /  ...  /  Get runner image
5s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
4s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
5s
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
4m 10s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration-tests / Build image / Build image (ghcr.io/canonical/mattermost:5974911199)
Canceling since a higher priority waiting request for 'operator-workflows-Integration tests-integration-tests-refs/pull/13/merge' exists
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
mattermost-k8s-charm Expired
6.44 MB
mattermost-k8s-images Expired
1 Byte