Skip to content

Incremental decommit #4055

Incremental decommit

Incremental decommit #4055

Triggered via pull request June 21, 2024 22:52
Status Cancelled
Total duration 12m 4s
Artifacts 6

ci-nix.yaml

on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Build haddock using nix
7m 15s
Build haddock using nix
Build specification using nix
1m 4s
Build specification using nix
Publish benchmark results
0s
Publish benchmark results
Publish test results
0s
Publish test results
Documentation
0s
Documentation
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Build & test (hydra-plutus)
Process completed with exit code 1.
Build & test (hydra-tui)
The job was canceled because "hydra-plutus" failed.
Build & test (hydra-tui)
The operation was canceled.
Build & test (hydra-cluster)
The job was canceled because "hydra-plutus" failed.
Build & test (hydra-cluster)
The operation was canceled.
Build & test (hydra-node)
The job was canceled because "hydra-plutus" failed.
Build & test (hydra-node)
The operation was canceled.
Benchmarks (hydra-node, tx-cost, --output-directory $(pwd)/../benchmarks)
Process completed with exit code 1.
Benchmarks (hydra-node, micro, -o $(pwd)/../benchmarks/ledger-bench.html)
The job was canceled because "hydra-node_tx-cost_--outp" failed.
Benchmarks (hydra-cluster, bench-e2e, datasets datasets/1-node.json datasets/3-nodes.json --outpu...
The job was canceled because "hydra-node_tx-cost_--outp" failed.
nix flake check
Canceling since a higher priority waiting request for 'CI-1344' exists
nix flake check
The operation was canceled.

Artifacts

Produced during runtime
Name Size
benchmarks-hydra-node-micro Expired
97 KB
benchmarks-plutus-merkle-tree-on-chain-cost Expired
437 Bytes
haddocks Expired
5.39 MB
hydra-spec Expired
700 KB
test-results-plutus-cbor Expired
708 Bytes
test-results-plutus-merkle-tree Expired
868 Bytes