Skip to content

Update workflow files for CI #159

Update workflow files for CI

Update workflow files for CI #159

Triggered via push August 11, 2024 23:51
Status Failure
Total duration 1m 30s
Artifacts

go.yml

on: push
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Build (macos-latest, 1.22)
Unable to locate executable file: docker. Please verify either the file path exists or the file can be found within a directory specified by the PATH environment variable. Also check the file mode to verify the file is executable.
Build (ubuntu-24.04, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (macos-14, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (macos-14, 1.22)
Unable to locate executable file: docker. Please verify either the file path exists or the file can be found within a directory specified by the PATH environment variable. Also check the file mode to verify the file is executable.
Build (ubuntu-22.04, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (windows-latest, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (windows-latest, 1.22)
The operation was canceled.
Build (windows-2022, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (windows-2022, 1.22)
The operation was canceled.
Build (windows-2019, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (windows-2019, 1.22)
The operation was canceled.
Build (macos-13, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (macos-13, 1.22)
The operation was canceled.
Build (macos-12, 1.22)
The job was canceled because "macos-latest_1_22" failed.
Build (macos-12, 1.22)
The operation was canceled.