continuous-integration #514
continuous-integration.yml
on: schedule
Skip duplicate runs
3s
Matrix: smoke test release-* branches when it's a scheduled run
Run linters
2m 45s
Run shellcheck linter
7s
Verify API doc is up to date
1m 38s
Verify CRD is up to date
21s
Matrix: Run unit tests
Run openshift-preflight test
0s
Run OLM scorecard test
0s
Matrix: olm-tests
Annotations
13 errors and 2 warnings
|
|
|
Verify API doc is up to date
Process completed with exit code 1.
|
Run unit tests (1.30.x)
Process completed with exit code 2.
|
Run unit tests (1.31.x)
The job was canceled because "_1_30_x" failed.
|
Run unit tests (1.31.x)
The operation was canceled.
|
Run unit tests (1.29.x)
The job was canceled because "_1_30_x" failed.
|
Run unit tests (1.29.x)
The operation was canceled.
|
Run unit tests (1.28.x)
The job was canceled because "_1_30_x" failed.
|
Run unit tests (1.28.x)
The operation was canceled.
|
Run unit tests (1.27.x)
The job was canceled because "_1_30_x" failed.
|
Run unit tests (1.27.x)
The operation was canceled.
|
Check changed files
'before' field is missing in event payload - changes will be detected from last commit
|
Run linters
Cache not found for keys: golangci-lint.cache-Linux-2877-88acb8d9d3891cbee0529e50a1e8b4649d7f100c, golangci-lint.cache-Linux-2877-
|