Skip to content

chore(deps): bump actions/setup-node from 4.0.4 to 4.1.0 #3944

chore(deps): bump actions/setup-node from 4.0.4 to 4.1.0

chore(deps): bump actions/setup-node from 4.0.4 to 4.1.0 #3944

Re-run triggered November 11, 2024 19:06
Status Failure
Total duration 6h 0m 25s
Artifacts 1

ember-test-audit.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

2 errors
time-base
The job running on runner GitHub Actions 1207 has exceeded the maximum execution time of 360 minutes.
time-base
The operation was canceled.