Skip to content

Use latest PG for sequel tests #1009

Use latest PG for sequel tests

Use latest PG for sequel tests #1009

Triggered via push August 9, 2023 17:26
Status Failure
Total duration 1d 12h 53m 45s
Artifacts

ci.yml

on: push
Matrix: bootstrap JRuby build
Matrix: mvn-test-8
Matrix: mvn-test-m1
Matrix: mvn-test
Matrix: rake-test-17-indy
Matrix: rake-test-8
Matrix: rake-test
jruby-tests-dev
3m 34s
jruby-tests-dev
ji-specs-8-indy
2m 7s
ji-specs-8-indy
regression-specs-jit
1m 35s
regression-specs-jit
mvn -Ptest, rake test:jruby (Windows, Java 11)
6m 47s
mvn -Ptest, rake test:jruby (Windows, Java 11)
Dependency check
1m 46s
Dependency check
Verify build artifacts
5m 14s
Verify build artifacts
sequel
40s
sequel
concurrent-ruby
6m 22s
concurrent-ruby
mvn -Ptest (OpenJ9 Java 8; disabled)
41s
mvn -Ptest (OpenJ9 Java 8; disabled)
Matrix: rake-test-wip-8
Matrix: spec-m1
publish-snapshot  /  publish
publish-snapshot / publish
Fit to window
Zoom out
Zoom in

Annotations

7 errors
sequel
Failed to initialize container postgres:latest
sequel
One or more containers failed to start.
mvn -Ptest, rake test:jruby (Windows, Java 11)
Process completed with exit code 1.
rake test:mri:stdlib_wip (Java 8)
Process completed with exit code 1.
rake test:mri:core_wip (Java 8)
Process completed with exit code 1.
rake spec:ffi (Java 11 Apple aarch64)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
mvn -Ptest (Java 11 Apple aarch64)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.