Skip to content

2.x: Upgrade Netty to 4.1.100.Final (#7819) #4139

2.x: Upgrade Netty to 4.1.100.Final (#7819)

2.x: Upgrade Netty to 4.1.100.Final (#7819) #4139

Triggered via push October 18, 2023 15:26
Status Failure
Total duration 45m 51s
Artifacts 2
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

validate.yml

on: push
Matrix: archetypes
Matrix: build
Matrix: examples
Matrix: packaging
Matrix: tck
Fit to window
Zoom out
Zoom in

Annotations

3 errors
packaging (ubuntu-20.04)
Process completed with exit code 255.
packaging (macos-latest)
The job was canceled because "ubuntu-20_04" failed.
packaging (macos-latest)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
docs Expired
6.73 MB
test-results Expired
4.21 MB