Skip to content
This repository was archived by the owner on Jul 23, 2023. It is now read-only.

Configure Renovate #37

Open
wants to merge 1 commit into
base: master
Choose a base branch
from
Open

Configure Renovate #37

wants to merge 1 commit into from

Conversation

renovate[bot]
Copy link

@renovate renovate bot commented Jul 4, 2020

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • go.mod (gomod)
  • .circleci/config.yml (circleci)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 open PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


What to Expect

With your current configuration, Renovate will create 14 Pull Requests:

Update github.com/shurcooL/githubv4 commit hash to e003124
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-shurcool-githubv4-digest
  • Merge into: master
  • Upgrade github.com/shurcooL/githubv4 to e003124d66e430e2f6b853080a90ddbc280a159b
Update golang.org/x/oauth2 commit hash to bf48bf1
  • Schedule: ["at any time"]
  • Branch name: renovate/golang.org-x-oauth2-digest
  • Merge into: master
  • Upgrade golang.org/x/oauth2 to bf48bf16ab8d622ce64ec6ce98d2c98f916b6303
Update golang.org/x/sync commit hash to 6e8e738
  • Schedule: ["at any time"]
  • Branch name: renovate/golang.org-x-sync-digest
  • Merge into: master
  • Upgrade golang.org/x/sync to 6e8e738ad208923de99951fe0b48239bfd864f28
Update module go-test/deep to v1.0.7
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-go-test-deep-1.x
  • Merge into: master
  • Upgrade github.com/go-test/deep to v1.0.7
Update module go.uber.org/dig to v1.10.0
  • Schedule: ["at any time"]
  • Branch name: renovate/go.uber.org-dig-1.x
  • Merge into: master
  • Upgrade go.uber.org/dig to v1.10.0
Update module go.uber.org/zap to v1.15.0
  • Schedule: ["at any time"]
  • Branch name: renovate/go.uber.org-zap-1.x
  • Merge into: master
  • Upgrade go.uber.org/zap to v1.15.0
Update module golang/mock to v1.4.3
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-golang-mock-1.x
  • Merge into: master
  • Upgrade github.com/golang/mock to v1.4.3
Update module google.golang.org/appengine to v1.6.6
  • Schedule: ["at any time"]
  • Branch name: renovate/google.golang.org-appengine-1.x
  • Merge into: master
  • Upgrade google.golang.org/appengine to v1.6.6
Update module google/go-github/v24 to v24.0.1
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-google-go-github-v24-24.x
  • Merge into: master
  • Upgrade github.com/google/go-github/v24 to v24.0.1
Update module gorilla/csrf to v1.7.0
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-gorilla-csrf-1.x
  • Merge into: master
  • Upgrade github.com/gorilla/csrf to v1.7.0
Update module gorilla/mux to v1.7.4
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-gorilla-mux-1.x
  • Merge into: master
  • Upgrade github.com/gorilla/mux to v1.7.4
Update module pkg/errors to v0.9.1
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-pkg-errors-0.x
  • Merge into: master
  • Upgrade github.com/pkg/errors to v0.9.1
Update module valyala/quicktemplate to v1.5.1
Update module favclip/testerator to v1
  • Schedule: ["at any time"]
  • Branch name: renovate/github.com-favclip-testerator-1.x
  • Merge into: master
  • Upgrade github.com/favclip/testerator to 08abefb730e5c6dd92827bbdc13eccfc34e473d9

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR has been generated by WhiteSource Renovate. View repository job log here.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant