Skip to content

chore: 更新依赖项 #88

chore: 更新依赖项

chore: 更新依赖项 #88

Triggered via push October 15, 2024 13:37
Status Failure
Total duration 21s
Artifacts

go.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Test (ubuntu-latest, 1.23.x): prompt/prompt.go#L16
no required module provides package github.com/issue9/sliceutil; to add it:
Test (ubuntu-latest, 1.23.x)
Process completed with exit code 1.
Test (ubuntu-latest, 1.18.0)
The job was canceled because "ubuntu-latest_1_23_x" failed.
Test (ubuntu-latest, 1.18.0)
The operation was canceled.
Test (windows-latest, 1.23.x)
The job was canceled because "ubuntu-latest_1_23_x" failed.
Test (windows-latest, 1.23.x)
The operation was canceled.
Test (macOS-latest, 1.18.0)
The job was canceled because "ubuntu-latest_1_23_x" failed.
Test (macOS-latest, 1.18.0)
The operation was canceled.
Test (macOS-latest, 1.23.x)
The job was canceled because "ubuntu-latest_1_23_x" failed.
Test (macOS-latest, 1.23.x)
The operation was canceled.
Test (windows-latest, 1.18.0)
The job was canceled because "ubuntu-latest_1_23_x" failed.
Test (windows-latest, 1.18.0)
The operation was canceled.