MTV-1717 | Wait for DV status to not be paused #1243
Merged
Red Hat Konflux / Red Hat Konflux / forklift-operator-enterprise-contract / pr group MTV-1717
succeeded
Dec 6, 2024 in 18m 58s
Succeeded
Integration test for snapshot forklift-operator-v97k5 and scenario forklift-operator-enterprise-contract has passed
Details
- Pipelinerun: forklift-operator-enterprise-contract-scrbv
Task | Duration | Test Suite | Status | Details |
---|---|---|---|---|
verify | 13m52s | ✔️ 1305 success(es) |
The group snapshot is generated for the component snasphots as below:
Component | Snapshot | BuildPipelineRun | PullRequest |
---|---|---|---|
forklift-operator | forklift-operator-hmtgp | forklift-operator-on-pull-request-w9rzp | forklift |
forklift-controller | forklift-operator-f8gv8 | forklift-controller-on-pull-request-9p99k | forklift |
Loading