Test nagfor #632
Triggered via schedule
September 23, 2024 19:05
Status
Success
Total duration
12h 17m 41s
Artifacts
10
test_nagfor.yml
on: schedule
Matrix: Run nagfor tests
check_success_timeout
14s
Annotations
4 errors
Run nagfor tests (i2, bobyqa, big)
The job running on runner zS0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, bobyqa, big)
The operation was canceled.
|
Run nagfor tests (i2, lincoa, big)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, lincoa, big)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
bobyqa-i2-big--fast
|
14 KB |
|
bobyqa-i2-small--fast
|
110 KB |
|
cobyla-i2-big--fast
|
179 KB |
|
cobyla-i2-small--fast
|
144 KB |
|
lincoa-i2-big--fast
|
331 KB |
|
lincoa-i2-small--fast
|
1 MB |
|
newuoa-i2-big--fast
|
14.2 KB |
|
newuoa-i2-small--fast
|
268 KB |
|
uobyqa-i2-big--fast
|
4 KB |
|
uobyqa-i2-small--fast
|
8.35 KB |
|