Test nagfor #635
Triggered via schedule
September 26, 2024 19:05
Status
Success
Total duration
11h 28m 25s
Artifacts
10
test_nagfor.yml
on: schedule
Matrix: Run nagfor tests
check_success_timeout
14s
Annotations
6 errors
Run nagfor tests (i2, bobyqa, big)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, bobyqa, big)
The operation was canceled.
|
Run nagfor tests (i2, lincoa, big)
The job running on runner zS1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, lincoa, big)
The operation was canceled.
|
Run nagfor tests (i2, newuoa, big)
The job running on runner zS0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, newuoa, big)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
bobyqa-i2-big--O2
|
14 KB |
|
bobyqa-i2-small--O2
|
110 KB |
|
cobyla-i2-big--O2
|
179 KB |
|
cobyla-i2-small--O2
|
144 KB |
|
lincoa-i2-big--O2
|
331 KB |
|
lincoa-i2-small--O2
|
1 MB |
|
newuoa-i2-big--O2
|
7.93 KB |
|
newuoa-i2-small--O2
|
268 KB |
|
uobyqa-i2-big--O2
|
4 KB |
|
uobyqa-i2-small--O2
|
8.94 KB |
|