This project is aimed at simulating the performance of a manufacturing system in a single day (8 hours). This system consists of 3 machines; A, B, and C. Each of these machines have their own unique work time, down time, and parts-arrival rate. The simulation model is run 10 times to estimate the performance parmeters of the system via point estimation and interval estimation. Each run consists of two phases: a warmup phase, and a main phase which the system is evaluated upon. The warmup phase is a 2 hour simulation and is used to reduce the bias of our estimations. After the simulation we also return charts about the performance of each machine to check for bottlenecks.
-
Notifications
You must be signed in to change notification settings - Fork 0
mainbrm1380/simulation
Folders and files
Name | Name | Last commit message | Last commit date | |
---|---|---|---|---|
Repository files navigation
About
Simulation of a stochastic system
Topics
Resources
Stars
Watchers
Forks
Releases
No releases published
Packages 0
No packages published