Skip to content

fix #175

fix #175 #166

Triggered via push December 29, 2024 15:33
Status Failure
Total duration 29s
Artifacts

ruby.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 1 warning
test (ubuntu-latest, 3.0)
Process completed with exit code 1.
test (ubuntu-latest, 3.3)
The job was canceled because "ubuntu-latest_3_0" failed.
test (ubuntu-latest, 3.3)
Process completed with exit code 1.
test (ubuntu-latest, 3.2)
The job was canceled because "ubuntu-latest_3_0" failed.
test (ubuntu-latest, 3.2)
The operation was canceled.
test (ubuntu-latest, 3.1)
The job was canceled because "ubuntu-latest_3_0" failed.
test (ubuntu-latest, 3.1)
The operation was canceled.
test (macos-latest, 3.0)
The job was canceled because "ubuntu-latest_3_0" failed.
test (macos-latest, 3.0)
The operation was canceled.
test (macos-latest, 3.2)
The job was canceled because "ubuntu-latest_3_0" failed.
test (macos-latest, 3.2)
The operation was canceled.
test (macos-latest, 3.1)
The job was canceled because "ubuntu-latest_3_0" failed.
test (macos-latest, 3.1)
The operation was canceled.
test (macos-latest, 3.3)
The job was canceled because "ubuntu-latest_3_0" failed.
test (macos-latest, 3.3)
The operation was canceled.
test (ubuntu-latest, 3.0)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636