test: test commit #10
Triggered via pull request
December 26, 2023 08:29
mcollovati
synchronize
#81
Status
Failure
Total duration
36m 27s
Artifacts
2
validation.yml
on: pull_request_target
Annotations
5 errors
UI tests 2
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 30 minutes.
|
UI tests 2
The operation was canceled.
|
UI tests 1
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 30 minutes.
|
UI tests 1
The operation was canceled.
|
test-results
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
saved-workspace
Expired
|
155 MB |
|
tests-output
Expired
|
209 KB |
|