Skip to content

Software Sustainability Institute Collaboration

mikej888 edited this page Jul 11, 2013 · 7 revisions

The Software Sustainability Institute

Workplan

Issues: Open All

Current Plan

  • --/05/13 - PID / Community survey #27 (1d)
  • WB03/06/13 - Development review #31 (5d) / Coding standards #32 (1d) / Meta manual #34 (2d) / Contribution policy #30 (1d)
  • WB10/06/13 - as above
  • WB17/06/13 - as above
  • WB24/06/13 - as above
  • WB01/07/13 - as above
  • WB08/07/13 - as above
  • WB15/07/13 - leave
  • WB22/07/13 - leave
  • WB29/07/13 - Survey results #28 (1d)
  • WB05/08/13 - Web site I #29 (5d)
  • WB12/08/13 - BoneJ software developer specification #37
  • WB19/08/13 - TODOs from Development review #31
  • ...
  • WB06/10/13 - End of stage report (1d)
  • To be scheduled - Initial blog post (0.5d) / Opportunistic blog posts 0.5d

Original Plan

  • --/05/13 - PID / Community survey #27 (1d)
  • WB03/06/13 - Development review #31 (5d)
  • WB17/06/13 - Coding standards #32 (1d) / Meta manual #34 (2d)
  • WB24/06/13 - Test infrastructure #33 (5d)
  • WB01/07/13 - Packager I #35(5d)
  • WB08/07/13 - Survey results #28 (1d) / Web site I #29 (5d) / Contribution policy #30 (1d)
  • End - End of stage report (1d)
  • To be scheduled - Initial blog post (0.5d / Opportunistic blog posts 0
Clone this wiki locally