Skip to content

Merge pull request #200 from metal-stack/network-cilium-v1.36.0 #1334

Merge pull request #200 from metal-stack/network-cilium-v1.36.0

Merge pull request #200 from metal-stack/network-cilium-v1.36.0 #1334

Triggered via push November 6, 2024 15:27
Status Failure
Total duration 3m 57s
Artifacts

integration.yaml

on: push
Matrix: Integration tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Integration tests (cumulus)
Process completed with exit code 2.
Integration tests (sonic)
The job was canceled because "cumulus" failed.
Integration tests (sonic)
The operation was canceled.